Energy Storage News: Industry Hot Topics Tracking!
Release time:
2025-08-11
Source:
On the morning of August 1, the National Development and Reform Commission (NDRC) held a press conference to interpret the current economic situation and economic work. Jiang Yi, director of the Policy Research Office of the NDRC, said that in the face of rapidly rising electricity demand, efforts should be made to strengthen the use of pumped storage and new energy storage, and to promote the synergy of various power sources such as "hydropower, thermal power, wind power, solar power, and energy storage". Next, the NDRC will enhance peak capacity, continuously strengthen the operation and management of various conventional power sources, and coordinate the supporting role of new energy power generation and the bottom-line guarantee role of thermal power. Active efforts will be made to carry out cross-provincial and cross-regional power dispatch through long-term and medium-term power contracts, spot markets, and emergency dispatch. Demand-side management will be optimized, adhering to the principles of prioritizing demand response, assisting energy conservation and electricity saving, and ensuring orderly electricity supply. A comprehensive approach will be used, including time-of-use electricity pricing, demand response subsidies, and AI dispatch of virtual power plants, to ensure the safe and stable operation of the power grid and the orderly supply of electricity.
National Policies and News
Local Policies and News
For competitive offshore photovoltaic projects that have been approved before June 1, 2025, the mechanism electricity price will be the benchmark price of coal-fired power generation, and the mechanism electricity price for deep-sea projects and high-cost photovoltaic projects will be separately clarified.
02 Henan Energy Supervision Office issued the "Detailed Rules for the Transaction of Henan Power Auxiliary Service Market"
On August 1, the Henan Energy Supervision Office issued the "Detailed Rules for the Transaction of Henan Power Auxiliary Service Market." The document mentions that in the initial stage of the market, the actual adjustment rate of independent energy storage shall not exceed 50 MW/minute. The declared frequency regulation capacity range of independent energy storage is 10%~15% of the rated capacity. The sellers of peak regulation auxiliary service transactions are tentatively set as coal-fired units and new energy storage. The real-time peak regulation transaction adopts a "step-by-step" quotation method and price mechanism, adopts a load rate segmented quotation, and when the load rate is less than 30%, the quotation range is between 300 yuan/MWh and 377.9 yuan/MWh.

The calculation cycle of the compensation fee for new energy storage peak regulation auxiliary service is 15 minutes, and the compensated electricity volume is the stored electricity volume participating in grid peak regulation within its calculation cycle. In the initial stage of the market, according to the "pre-day quotation, real-time clearing" trading mechanism, the compensation price will be fairly cleared according to the first-tier peak regulation auxiliary service transaction settlement price of coal-fired units in our province, and the energy storage peak regulation compensation fee = compensated electricity volume × compensation price.
The energy storage projects that are built can be transformed into independent energy storage projects to participate in the power peak regulation auxiliary service market by means of technical transformation to meet the same technical conditions and safety standards as independent energy storage projects. The new energy storage involved in wind, light, water, fire, and storage multi-energy complementary integrated projects will not be transformed into independent energy storage in principle, and will not participate in the power peak regulation auxiliary service market for the time being.
When the load response rate is less than 50%, the response in this time period is invalid and will not be compensated; when the load response rate is between 50% and 130%, compensation will be made according to the actual peak regulation contribution multiplied by the clearing price; when the load response rate is higher than 130%, the part exceeding 130% will not be compensated.
03 The Shandong Supervision Office of the National Energy Administration issued a notice on soliciting opinions on the "Draft Shandong Power Market Rules (Trial)"
On July 29, the Shandong Supervision Office of the National Energy Administration issued a notice on soliciting opinions on the "Draft Shandong Power Market Rules (Trial)". The new "Draft Shandong Power Market Rules (Trial)" has 21 chapters, namely: General Provisions, Market Participants, Market Structure and Prices, Long-term Market Operation, Spot Market Operation, Day-ahead Market Transaction Organization, Reliable Unit Combination and Generation Plan, Intraday Market Transaction Organization, Real-time Market Transaction Organization, Auxiliary Service Market Operation, Retail Market Operation, Measurement, Market Settlement, Market Power Conduct Supervision, Information Disclosure, Risk Prevention and Control, Market Intervention, Power Market Technical Support System, Dispute Resolution, Legal Liability, and Supplementary Provisions.
04 The Zhuhai Development and Reform Bureau of Guangdong Province publicly solicited opinions on the "Zhuhai Electrochemical Energy Storage Safety Supervision Measures"
On July 29, the Zhuhai Development and Reform Bureau of Guangdong Province publicly solicited opinions on the "Zhuhai Electrochemical Energy Storage Safety Supervision Measures." The Measures apply to the operation and supervision and management of electrochemical energy storage with a rated power of not less than 100 kilowatts or energy of not less than 100 kilowatt-hours constructed (including new construction, reconstruction, and expansion) within the administrative area. According to statistics, the newly installed capacity of electrochemical energy storage in Zhuhai in 2025 is expected to exceed 235 MWh, exceeding the historical total.
Lithium-ion battery energy storage units should not be located underground, semi-underground, in high-rise buildings, commercial complexes, or densely populated areas.
Incoming inspections should be entrusted to institutions with professional testing and inspection qualifications for energy storage. Sample selection for inspections should meet the batch and product consistency sampling requirements, and the inspection results should meet the safety performance technical requirements of national (industry) standards.
Electrochemical energy storage owners (project legal persons) and maintenance units should organize drills on electrolyte leakage disposal, battery thermal runaway, and fire accidents once every six months, conduct timely summary assessments, and revise emergency plans in a timely manner based on the actual situation.
Newly built, rebuilt, and expanded electrochemical energy storage within this city shall not use cascaded used power batteries, except for those with safety assessment reports issued by relevant qualified institutions.
Previously, Zhuhai lacked specific safety management policies for electrochemical energy storage. This measure is the first to be formulated. Compared with previous scattered relevant regulations, this measure comprehensively integrates the safety management requirements of the entire life cycle of electrochemical energy storage power stations, forming a systematic and complete management system, filling the gap in the safety management of electrochemical energy storage power stations in Zhuhai, and making clearer and more specific provisions in terms of planning and site selection, project filing, design and construction, and grid connection operation.
Key words:
Previous
Previous Page:
Recommended News
Contact
Address: Chanhe Innovation Technology Park, No. 2 Zhenxing Road, Chanhe Hui District, Luoyang City, Henan Province
Tel:0379-63869669
Mailbox:info@hydromobility.cn
Scan

Copyright©2023 Qingcheng Power Technology(Luoyang) Co.,Ltd. This website supports ipv6
Copyright©2023 Qingcheng Power Technology(Luoyang) Co.,Ltd.
This website supports ipv6